Bellata Culvert Remediation Project
Project Overview
The project involved the remediation of three rail culverts - Boggy Creek, Bulldog Creek, and Pan Creek on the Inland Rail, Narrabri to North Star section near Bellata.
Key scope elements included:
- Mobilisation, site establishment, supervision.
- Implementation of erosion and sediment control measures.
- Bulk earthworks including topsoil stripping, cut and fill operations, bund construction and open drain works.
- Placement of armour rock, including geotextile installation and rip rap protection works.
- Revegetation and rehabilitation works including topsoiling, coir mesh installation.
Plant required to complete project:
- Skid steer loader
- 23t excavator
- 30t articulated dump trucks (ADTs)
- 140m grader
- ADT watercart
- 16t padfoot roller
- D6 dozer