Bellata Culvert Remediation Project 

Project Overview


The project involved the remediation of three rail culverts - Boggy Creek, Bulldog Creek, and Pan Creek on the Inland Rail, Narrabri to North Star section near Bellata. 


Key scope elements included: 

  • Mobilisation, site establishment, supervision. 
  • Implementation of erosion and sediment control measures. 
  • Bulk earthworks including topsoil stripping, cut and fill operations, bund construction and open drain works. 
  • Placement of armour rock, including geotextile installation and rip rap protection works. 
  • Revegetation and rehabilitation works including topsoiling, coir mesh installation. 

 

Plant required to complete project: 

  • Skid steer loader 
  • 23t excavator 
  • 30t articulated dump trucks (ADTs) 
  • 140m grader 
  • ADT watercart 
  • 16t padfoot roller 
  • D6 dozer